logo

PRINCE 2 Tracking Progress with PRINCE 2 Certificate

Posted by Marbenz Antonio on January 30, 2023

The definitive guide to website project management

PRINCE 2 uses the “PROGRESS” theme to track project progress. PRINCE 2 Certificate involves monitoring actual results and comparing them to planned objectives. It also includes forecasting the project goals and assessing the project’s continued viability, while taking corrective action for any unacceptable deviations.

Tolerances are used by PRINCE 2 with certificate monitor deviations. Tolerances are the acceptable variation from the goal of a plan for time, cost, and maybe quality, scope, benefits, and risk before senior management needs to be informed.

Progress control involves comparing actual progress to performance targets for time, cost, quality, scope, benefits, and risk. This information is used to make decisions such as approval of a stage or work package, escalation of deviations, and early closure of the project. The steps for tracking progress are:

  • Setup Project Controls for Delegations and Tolerance

The project manager utilizes the following management products to establish progress control baselines.

Project Plan – includes the project-level performance targets and tolerances.

Stage Plan – Includes the basis of the day-to-day control of the stage.

Exception Plan – The Project Board may request an Exception Plan in response to reviewing an Exception Report during the exception handling process. It outlines steps for addressing exceptional situations.

Work Packages – The Project Manager approves a Work Package, which outlines the details of the work to be completed by a team member or Team Manager during a stage.

Tolerances are set as below for each of the aspects of the project:

Tolerance areaProject LevelStage LevelWork package levelProduct Level
Scope Project PlanStage PlanWork PackageN/A
Time Project PlanStage PlanWork PackageN/A
CostProject PlanStage PlanWork PackageN/A
QualityProject Product DescriptionN/AN/AProduct Description
RiskRisk Management ApproachStage PlanWork PackageN/A
BenefitsBusiness CaseN/AN/AN/A
  • Dividing the project into management stages and approving each stage separately: PRINCE2® divides a project into multiple management stages, which are sections of the project with decision points. The Project Board approves each stage individually. A minimum of 2 management stages are required in a PRINCE2 project, determined by the Project Manager in consultation with the Project Board.
  • Report and review progress through Time-driven reports: There may be instances when the agreed limits for tolerances are exceeded in one or more areas.

An exception is a forecasted deviation beyond the agreed tolerance levels.

Exceptions can happen at three levels:

  • Work-Package-level exceptions
  • Stage-level exceptions
  • Project-level exceptions 

Depending on the severity of the exception, decisions are made by the appropriate authority. If the exception occurs at the work package level, the Project Manager will provide recommendations for corrective actions.

If the exception is at the stage level, the Project Manager will escalate the issue to the Project Board for decision-making.

Want to know more about PRINCE 2? Visit our course now.

How about Agile? We have here covered for you as well.


Here at CourseMonster, we know how hard it may be to find the right time and funds for training. We provide effective training programs that enable you to select the training option that best meets the demands of your company.

For more information, please get in touch with one of our course advisers today or contact us at training@coursemonster.com

Verified by MonsterInsights